Aerial view of a mining operation used in CCMENG mine planning

Geological accuracy and operational efficiency

Mine planning

Block models, pit design, sequencing and short-, medium- and long-term mine plans for safe and economically consistent decisions.

Fast, safe and decision-ready data.

CCM Engenharia develops the plan from geological models and resource analysis through final pit design, mining phases and operational sequencing.

The study integrates geology, geotechnics, costs, infrastructure, environmental constraints and production targets to turn mineral resources into an executable, auditable plan.

Request a quote
REAL OPERATION / CCMENG

Technology connected to engineering.

01

Short-, medium- and long-term LOMP

Pit limits, production phases, recovery, expansion and targets throughout the life of mine.

02

Block models and feasibility

Integration of grade, volume, tonnage, resources, reserves and economic assumptions in comparable scenarios.

03

Semester sequencing

Planning of activities, milestones, integrated schedules and updates to operating scenarios.

04

Pit and infrastructure design

Benches, crests, toes, ramps, drainage, fleet, stockpiles, access roads and support structures.

Clear, complete and auditable deliverables.

  • Short-, medium- and long-term Life of Mine Plan
  • Semester sequencing and integrated schedules
  • Block models and resource and reserve estimates
  • Final pit, mining phases and operating designs
  • Conceptual sizing of drainage, fleet and stockpiles
  • Maps, plans, tables, figures and technical reports

Integrated CCMENG portfolio

01Stockpile inventory02Surveying, LiDAR and drones03Geology, geotechnics and geomechanics05Environmental engineering

Let’s build together

Your next challenge starts with a good conversation.

Tell us about your project. CCM Engenharia is ready to understand your needs and recommend the next step.